MetalNRG PLC
Gold Ridge Arizona Phase 1 August 2019 MetalNRG PLC 10 100ft N Gold Prince #6 level portal and dump View shows the dump outside of the #6 portal. It is at least 215’ long and 115’ wide. Depth of potential ore to be determined Waste Approx locations of sample digs #6 Level Portal Waste
Made with FlippingBook
RkJQdWJsaXNoZXIy NTYzMzA=